After successful hydro static testing is over, the boiler was drained.   After the
man-way came off, Dr. Mike hammered the boiler stays.   With a newly annealed
copper gasket in place and the man-way back on, air pressure was used to blow
out dry pipe, throttle, manifold, superheater tubes, etc.   (movie 0:53).