11-17-07 More cab work and general work
11-24-07 Christmas card Mailing
12-01-07 Abatement prep work
12-1 thru 12-08 Abatement
12-29-07 Ongoing Superheater removal
1-2-08 Flue blow out
1-12-08 Sand Dome Removal
1-20-08 Feedwater Heater removal
1-26-08 Griding the firebox for UT
2-2-08 Rear deck, gridding and tender piping.
2-16-08 Pedestal, cab floor and ramp work.
2-24-08 Pedestal, new UT device and needle scaling
3-2-08 Back head gridding, accessory removal, Wolf Fengler visit
3-8-08 Throttle removal, backhead gridding
3-15-08 More gridding, pipe work.
3-19-08 Asbestos abatement final day
3-22-08 Track maintenence day
4-5-08 Pilot placement, air pipe work on tender
4-8-08 Gov. Richardson visits our site.
4-19-08 UT testing, cleaning, gridding.
5-3-08 More needle scaling, UT testing and gridding.
5-10-08 Why some of us didn't make it to work today
5-17-08 Mikes mom visits, more UT, Clems chemistry experiment
5-24-08 More UT, electrolysis, parts cleaning.
6-07-08 More of the same and Safety refresher
6-21-08 Finishing exterior U/T, cleaning
6-28-08 Forklift engine rebuild, Flying porta-potties, more U/T
7-5-08 More ( Does it ever end? ) U/T, general work
7-19-08 Wolf Fengler visit, painting prep and general projects
7-25-08 Tender painting
7-26-08 Compressor work general labor